Sun Microsystems 816-0830-12 Switch User Manual


 
Chapter 4 Hardware Installation 47
FIGURE 4-4 Installing Four 8-Port Switches Into the Mounting Rails
Installing the Vent Panel
This section describes how to install the vent panel on the switches in your
configuration.
“To Install the Vent Panel on Two 8-Port Switches” on page 47
“To Install the Vent Panels on Four 8-Port Switches” on page 48
“To Install the Vent Panel on a 16-Port Switch” on page 49
To Install the Vent Panel on Two 8-Port Switches
1. Mount the 1-U filler panel at the very top. Tighten the captive screws.