Sun Microsystems 816-0830-12 Switch User Manual


 
54 Sun StorEdge Network FC Switch-8 and Switch-16 Installation and Configuration Guide October 2001
FIGURE 4-11 Power Connection for Two or Four Switches
2. Install the GBIC.
See the “Removal and Replacement Procedures” chapter of the SANbox 8/16
Segmented Loop Switch User’s Manual for instructions on installing a GBIC.
3. Use a tie wrap to secure the Fibre Channel cables, as shown in
FIGURE 4-12 and
FIGURE 4-13.
Switch 1
Switch 2
Switch 3
Switch 4
Power
cords