Sun Microsystems 816-0830-12 Switch User Manual


 
48 Sun StorEdge Network FC Switch-8 and Switch-16 Installation and Configuration Guide October 2001
2. Mount the 1-U filler panel above the vent panel and below the existing 2-U filler
panel.
3. Tighten the captive screws.
FIGURE 4-5 Installing the Vent Panel— Two 8-Port Switch Configuration
To Install the Vent Panels on Four 8-Port
Switches
1. Mount each of the two vent panels over the front of a set of two switches.
No filler panel is necessary.
2. Tighten the captive screws.
1-U filler panel
3- U Vent panel