Chapter 4 Replacing Cold-Swappable Components 4-27
FIGURE 4-15 Replacing the RAID 0/1 Expansion Module
4.7.2 Verifying the RAID 0/1 Expansion Module
Installation
Refer to the Sun Blade G2 RAID 0/1 Expansion Module Installation Guide (820-5448) for
details.
Note – Check all SAS cables to ensure that they are securely attached and are not
damaged or pinched anywhere along the length of cable.