R61509V Target Spec
Rev. 0.11 April 25, 2008, page 62 of 181
Panel Interface Control 7 (R021h)
NOWE[2:0]: Sets the non-overlap period of adjacent gate outputs. NOWE is enabled when RGB interface
is selected.
Table 33
NOWE[2:0] Non-overlap period
3’h0 0 clocks
3’h1 1 clock
3’h2 2 clocks
3’h3 3 clocks
3’h4 4 clocks
3’h5 5 clocks
3’h6 6 clocks
3’h7 7 clocks
Note: 1 clock = (number of data transfer/pixel) x DIVE (division ratio) x (PCDIVL + PCDIVH) [DOTCLK]
SDTE[2:0]: Sets the source output delay period from the reference point when the R61509V’s display
operation is synchronized with DOTCLK (DM = 2’h1). For the relationships between signals, see Liquid
Crystal Panel Interface Timing.
Table 34
SDTE[2:0] Source output delay period
3’h0 0 clocks
3’h1 1 clock
3’h2 2 clocks
3’h3 3 clocks
3’h4 4 clocks
3’h5 5 clocks
3’h6 6 clocks
3’h7 7 clocks
Notes: 1. The number of clocks in the table setting is measured from the reference point.
2. 1 clock = DOTCLKD (when pixel data is transferred in one- transfer)
3. The reference point is falling edge of gate control signals.
R/W RS IB15 IB14 IB13 IB12 IB11 IB10 IB9 IB8 IB7 IB6 IB5 IB4 IB3 IB2 IB1 IB0
R/W 1 0 0 0 0 0
NOW
E[2]
NOW
E[1]
NOW
E[0]
0 0 0 0 0
SDTE
[2]
SDTE
[1]
SDTE
[0]
Default 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 1