Extreme Networks 17001 Switch User Manual


 
Installing Summit Family Switches
Summit Family Switches Hardware Installation Guide
156
Figure 132: Securing the Switch to the Front Rack Posts—Cabinet Installation
7 At each side, fasten the mounting bracket to the back rack post using suitable screws.
After the switch is secured to the rack, install and connect power supplies as described in “Installing a
Summit X650 AC Power Supply” or “Installing a Summit X650 DC Power Supply” on page 158.
Installing Summit X650 Power Supplies
The Summit X650 series switch is shipped without installed power supplies. The switch accommodates
one or two Summit X650 power supply units (PSUs).
AC Power Supply Cords
An AC power cord is not included with the Summit X650 AC PSU. AC power cords for use in the US
and Canada from Extreme Networks or from your local supplier. The cord must meet the following
requirements:
The power cord must be agency-certified for the country of use and rated for 100-240 V AC.
The power cord must have an IEC 320 C13 connector for connection to the PSU.
The power cord must have an appropriately rated and approved wall plug applicable to the country
of installation.
For cords up to 6 feet (2 m) long, the wire size must be 18 AWG (.75 mm
2
) minimum; over 6 feet, the
minimum wire size is 16 AWG (1.0 mm
2
).
For additional power cord requirements, see “Selecting Power Supply Cords” on page 218.
SH_084