5 - 23
Select a Power Plan
Windows Embedded Standard 7 and Windows 7 Professional only
Start > Control Panel > Power Options (Large or Small Icon View)
The Thor VM2 has four power management plans defined. The active Power Plan depends on:
• The user selected Power Plan
• And, for Ignition Control, the status of the ignition input signal.
Each power management scheme plan two sets of time out values:
• Plugged in for when external power is present (such as vehicle power or from an AC power adapter)
• Running on batteries for when external power is not present and the Thor VM2 is operating on UPS power.