NEC 2400 ipx Network Router User Manual


 
ND-71548 (E) CHAPTER 3
Page 231
Issue 2
INSTALLATION PROCEDURE
Figure 015-24 Cable Connection Diagram for Distributing Clock from a Digital Interface (Single IMG
Configuration)
NAP-200-015
Sheet 31/32
Cable Termination and Cross
Connections from MDF to Peripheral
Equipment, C. O. Lines, and Tie Lines
ATTENTION
Contents
Static Sensitive
Handling
Precautions Required
PLO
maximum 100
meters (330 feet)
MDF
IMG1
PCM
Carrier
Equipment/
DSU
CLK
PCM Cable (2P)
LT Connector
TSW
BASEU
to other node
RA
RB
TA
TB
POUTA
POUTB
DIU0A0
DIU0B0
DIU1A0
DIU1B0
DIU2A0
DIU2B0
DIU3A0
DIU3B0
DIU0A1
DIU0B1
DIU1A1
DIU1B1
DIU2A1
DIU2B1
DIU3A1
DIU3B1
#1
#2
#3
#4
#1
#2
#3
#4
for PLO #0
for PLO #1
Installation Cable
Installation Cable
Digital
Interface
(24AWG)
Note 1
Note 2
Note 1: PLO has a maximum of four inputs. DIU1xx leads are used for the first clock distribution routes. Thus,
DIU4xx leads are used for the fourth. The first input has the highest priority.
Note 2: This connection is required for a dual-TSW system.
Cable Connection Diagram
Perform the following wirings at the MDF. The following connection diagram shows an example where the Digital
Trunk POUT leads are used as the 1st clock distribution route.
maximum 200 meters (660 feet) (24AWG)
“PLO”