NEC 2400 ipx Network Router User Manual


 
ND-71548 (E) CHAPTER 3
Page 39
Issue 2
INSTALLATION PROCEDURE
This NAP explains the following work items:
Confirmation of Equipment Locations
Confirmation of Floor Layout
Confirmation of Power and Ground Supply
Check of Quantity of Equipment Packages
Note 1: Confirmation procedures are discussed in Chapter 2 of this manual.
Note 2: Be sure to correct any abnormal conditions encountered during installation preparation (missing hard-
ware, floor not level, etc.) before proceeding to the next step.
NAP-200-001
Sheet 1/2
Installation Preparation
Confirmation of Equipment
Locations
Environmental Confirmation of temperature and
humidity.
Floor Space
Floor Load
Equipment Room Floor surface
Wall
Ceiling
Lighting facilities
According to the floor layout,
confirm that the equipment
locations are appropriate.
Improper Locations:
An open aisle or place where sprinklers are provided.
A place where there is a water pipeline.
A place where there is a pipeline generating heat and an
exhaust for such heat.
A location near an exhaust port for corrosive fumes or gas
generated from a facility machine.
A location near a copying machine or apparatus which dis-
sipates heat.
A location where the switch will be exposed to direct sun-
light.
A location near a kitchen facility, etc., from which vapor is
generated.
A high EMI environment; for example, a location near an
elevator motor or X-ray equipment.
START
A
B