ND-71548 (E) CHAPTER 3
Page 277
Issue 2
INSTALLATION PROCEDURE
This NAP explains the installation of Maintenance Administration Terminal (MAT) and System Message Printer
focusing on their cable connections.
1. INSTALLATION OF MAT AND CABLE CONNECTIONS
NAP-200-017
Sheet 1/10
Installation of Maintenance
Administration Terminal (MAT) and Cable
Connections
START
Preparation of the MAT Set up PC, CRT Display, Printer, and so on.
Cable Connection Connect the cables between the MAT and the PBX
referring to Figures 017-1 and 017-2.
END
ATTENTION
Contents
Static Sensitive
Handling
Precautions Required