NEC 2400 ipx Network Router User Manual


 
CHAPTER 7 ND-71548 (E)
Page 390
Issue 2
WORK AFTER INSTALLATION TESTS
2. PREPARATION OF TEST RESULT REPORT
When submitting a report of test results to the end user or when performing test with customer’s representatives
attending, prepare Test Result Report and record the test results into the prepared Test Result Report.
3. MOUNTING OF THE FRONT AND REAR COVERS
When mounting the front cover and the rear cover of the PBX, follow the procedure below.
START
Inspection Set all MB switches back to their positions prior to the
installation tests. Confirm that all circuit cards are
mounted in the proper slots according to the Bayface
Layout.
Mounting of Side Covers Referring to Figure 7-1 through Figure 7-3, mount the
side covers onto the Modules and the Fan Unit.
Mounting of Rear Covers Modules Referring to Figure 7-4 and Figure 7-5, mount the rear
covers.
Fan Unit Referring to Figure 7-6 mount the rear covers.
Mounting of Front Covers Modules Referring to Figure 7-7 through Figure 7-9, mount the
front cover (A).
Check Confirm that the mounted covers do not contact any of
the cables, circuit cards, etc.
END