XEROX COAX/TWINAX OPTION
Reinstalling the system controller board
14. Place the system controller board into the receiving rails of
the printer.
15. For reinstallation of the system controller board, reverse the
removal process in steps 1 to 6.
Caution: Cable connectors may interfere with reinstallation
of the system controller board; therefore, route them
carefully.
Installation of adapter cable (Twinax only)
16. Remove the Twinax adapter cable from the package, if you
have not already done so.
17. Connect the adapter cable to the D-shell connector, as
shown in figure A3-10.
XEROX 4213 LASER PRINTER USER GUIDE A3-15