3Com 3CRWX120695A WXR100 Switch User Manual


 
Generating RF Network Design Information 155
Generating RF
Network Design
Information
After 3WXM has calculated the number of MAPs required to provide
wireless coverage, you can generate a work order report. The work order
report provides all of the necessary information for the physical
installation of the 3Com Mobility System. A work order shows where the
MAPs should be installed, WX initial setup configuration information, and
projected RSSI information that is useful when verifying the installation.
After deployment, you can generate a work order with the optional RSSI
projection tables and MAP MAC addresses, and use it for
post-deployment verification.
To generate a work order report
1 Display the floor plan in the Content panel.
2 In the Task List panel, click RF Planning.
3 Under RF Planning, click Work Order Report. The Work Order Generation
dialog is displayed.