Chapter 4 FRU Replacement Preparation 4-35
M9000 Server Single-Phase and Dual Power Feed
FIGURE 4-8 Main Line Switch (M9000 Server with Dual Power Feed)
Main line switch for
Expansion cabinet (x5)
ACS_B#1
Main line
switch (x5)
ACS_B#0
Main line switch for
dual power feed (x5)
ACS_B#3
Main line swtich
for dual power
feed (x5)
ACS_B#2
Base cabinet
Front
Expansion cabinet
Power cabinet
(for Expansion cabinet)
Power cabinet
(for Base cabinet)