4-44 SPARC Enterprise M8000/M9000 Servers Service Manual October 2012
For server using three-phase power feed:
Note – The server using three-phase power feed does not have any cable holder. In this
case, fasten the cables by running the hook-and-loop fastener through the slit between the
bracket at the cable holder mounting location and a column in the cabinet. (
FIGURE 4-13
shows the fastening location on the left route.)
FIGURE 4-13 Cable Routing of the Server Using Three-Phase Power Feed
6. Fasten the cables running along the left route to the cable holder with a long
hook-and-loop fastener. (See (4) in
FIGURE 4-14)
7. Allow 12 cables of all the cables running along the right route to hang along the right
frame. (See (5) in
FIGURE 4-14)
8. Run the remaining cables from the right side to the left side while taking care to
prevent the cables from blocking the ventilation slits. (See (6) in
FIGURE 4-14)
Note – It is recommended to run the cables above the handle of the FAN unit.
9. Fasten 24 cables with a short hook-and-loop fastener to the handle of the fan shelf.
(See (7) in
FIGURE 4-14)