Nortel Networks 350 Switch User Manual


 
309979-A Rev 00
2-1
Chapter 2
Installing the BayStack 350 Switch
This chapter covers the following topics:
Installation requirements
Installation procedure
Instructions for connecting power
Instructions for verifying the installation
Instructions for the initial switch setup
Refer to Chapter 3, “Using the Console Interface,” to further configure your
BayStack 350 switch.
Installation Requirements
Before installing the BayStack 350 switch, verify that the package contains the
items shown in Figure 2-1
.
Install the BayStack 350 switch in a ventilated area that is dust free and away from
heat vents, warm air exhaust from other equipment, and direct sunlight. Avoid
proximity to large electric motors or other electromagnetic equipment. When
choosing a location, observe the environmental guidelines listed in Appendix A,
“Technical Specifications.” You will need a Phillips screwdriver for the
installation.
Note:
Be sure that the supplied AC power cord matches the requirements for
your region; see “AC Power Receptacle” on page 1-7.