Nortel Networks AN/DC Network Card User Manual


 
Installing and Operating AN/DC and ANH-8/DC Systems
2-6
312410-A Rev 00
Environmental Requirements
The ANH-8/DC installation site must meet the following environmental
specifications:
Maximum Altitude: 10,000 ft (3000 m)
Relative Humidity (Operating): 5% to 85%, noncondensing
Maximum Humidity (Storage): 95%, noncondensing
Operating Temperature: 41°F to 104°F (5°C to 40°C) stable
Storage Temperature: -58°F to 113°F (-50° to 45°C)
These requirements meet IEC 721-3 Class 3K3 climatic conditions while under
operation and IEC 721-3 Class 1K3 climatic conditions while under storage.
Installing the ANH-8/DC
Once you are ready to install the ANH-8/DC in its final location, proceed with one
of the three sections below. You can
Position the ANH-8/DC on a flat, sturdy, horizontal surface.
Install the ANH-8/DC in an electronic enclosure rack.
Mount the ANH-8/DC on a wall.
Positioning the ANH-8/DC on a Flat Surface
To position the ANH-8/DC on a flat surface:
1.
Make sure that the surface is large enough for the ANH-8/DC to operate
properly.
The surface must be sturdy enough to support the combined weight of the
ANH-8/DC and any cables you connect.
2.
Peel the paper backing off the four rubber feet and attach them to the
bottom of the ANH-8/DC.
3.
Set the ANH-8/DC in the chosen location.
You can now connect the network cables to the ANH-8/DC. Go to the section
Connecting Communications Cables
,” later in this chapter.