Cisco Systems NPE-225 Network Card User Manual


 
9-24
Network Processing Engine and Network Services Engine Installation and Configuration
OL-4448-12
Chapter 9 Removing and Installing the NPE or NSE
Removing and Replacing the NPE or NSE
Warning
Read the installation instructions before you connect the system to its power source.
Statement 10
Note When installing an NPE-175, NPE-225, NPE-300, NPE-400, or NSE-1 in a Cisco 7200 VXR router that
is using a previously purchased I/O controller, you must upgrade the I/O controller boot helper image.
Instructions for upgrading the boot helper image on the I/O controller are contained in the online
Memory Replacement Instructions for the Network Processing Engine or Network Services Engine and
Input/Output Controller publication.
To reconnect AC-input power or DC-input power to a Cisco 7200 series router, Cisco 7200 VXR router,
or Cisco
uBR7200 series router, see these sections:
Reconnecting AC-Input Power to the Cisco 7200 Series Router or Cisco 7200 VXR Router,
page 9-25
Reconnecting AC-Input Power to the Cisco uBR7200 Series Router, page 9-26
Reconnecting DC-Input Power to a Cisco 7200 Series Router or Cisco 7200 VXR Router, page 9-27
Reconnecting DC-Input Power to a Cisco uBR7246VXR Router, page 9-29
Powering Up the Router, page 9-33