Cisco Systems NPE-225 Network Card User Manual


 
9-34
Network Processing Engine and Network Services Engine Installation and Configuration
OL-4448-12
Chapter 9 Removing and Installing the NPE or NSE
Removing and Replacing the NPE or NSE
Step 5 Observe the initialization process. When the system boot is complete (a few seconds), the network
processing engine or network services engine begins to initialize the port adapters and the I/O controller.
During this initialization, the LEDs on each port
adapter behave differently (most flash on and off). The
enabled LED on each port adapter and Cisco
uBR7200 series cable interface line card goes on when
initialization is completed, and the console screen displays a script and system banner similar to the
following:
Cisco Internetwork Operating System Software
IOS (tm) 7200 Software (C7200-J-M), 11.3(2)T
Copyright (c) 1986-1998 by cisco Systems, Inc.
Compiled Sun 22-Feb-98 06:00 by Biff
This completes the procedures for connecting input power and powering up the router. This also
completes the procedure for installing the network processing engine or network services engine in a
Cisco 7200 series router, Cisco 7200 VXR router, or Cisco uBR7200 series router.