Avaya V880 Personal Computer User Manual


 
Unpacking and inventorying the equipment
Issue 2.0 June 2004 23
Parts list
Verify that you have the following components before you begin the installation:
!
Important:
!
Important:
Important: DO NOT install internal hardware shipped loose with the Sun machine at
this time. This will be done under the direction of the CMS Provisioning
Engineer at a scheduled appointment time.
Sun Fire V880 cabinet (including installed cards and disk drives)
Computer power supply AC power cords (3)
Monitor, cable, and monitor AC power cord
USB keyboard and cable
USB mouse and cable
A package of blank tapes for backups
One tape that contains the Avaya factory configuration CMSADM filesystem backup
Category 5 LAN cable
Modem and cables
Keys
Sun and CMS software
Note:
Note: Starting around June, 2004, CMS servers will no longer ship with tape drive
cleaning tapes. Avaya recommends that customers purchase at least one
cleaning tape as soon as the server is installed and in service.