Cisco Systems MGX 8230 Network Router User Manual


 
Contents
ix
Cisco MGX 8230 Edge Concentrator Installation and Configuration
Release 1.1.31, Part Number 78-11215-03 Rev. B0, May 2001
Mechanical Lift Guidelines 4-1
Installing a Stand-Alone MGX 8230 4-2
Rack Mounting an MGX 8230 4-2
Prepare for Rack Installation 4-3
Rack Positioning 4-3
Bracket Placement 4-3
Mounting Kits 4-4
Install the MGX 8230 Using a Mechanical Lift (Recommended) 4-6
Rack Mounting Procedures for 19-Inch Racks (Mechanical Lift) 4-6
Rack Mounting Procedures for 23-Inch Racks (Mechanical Lift) 4-6
Install the MGX 8230 Without a Mechanical Lift (Optional) 4-7
Prepare for Installation 4-7
Remove the Front Cards 4-7
Remove the Back Cards 4-8
Rack Mount the MGX 8230 chassis 4-8
Re-install the front cards 4-10
Re-install the back cards 4-10
Connecting Power for DC Systems 4-11
Connecting Power for AC Systems 4-14
Installing AC Power Supply Modules in the AC Power Supply Tray (optional) 4-15
Making the Connections to the AC Power Supply Module(s) 4-15
Install the Cable Manager 4-17
Power up the MGX 8230 4-18
CHAPTER
5 Configuring the MGX 8230 Shelf 5-1
Summary of Shelf-Level Tasks 5-1
User Interface Access Ports 5-2
Control Port 5-2
Ethernet Port 5-2
Maintenance Port 5-3
Other Ports 5-3
IP-Based Applications 5-3
MGX 8230 MGX to BPX Feeder 5-3
Initial MGX 8230 Bring-Up 5-3
Bringing Up an MGX 8230 PXM With No Run-time Firmware 5-4
Configuring Node-Level Parameters 5-6
Resource Partitioning 5-6
Downloading Firmware to a Service Module 5-9
MGX 8230 CLI Configuration of a Feeder 5-10