Started
The date and time at which the operation was started is displayed.
Status
The status of the executed operation is displayed.
The date and time at which the process was completed is displayed.
Point
When an operation is executed in a tab other than the [Resource] tab, e.g., the [L-Platform] tab, multiple entries might be displayed in the
Recent Operations for that single operation.
When multiple entries are displayed, match the resource name displayed in the tab on which the operation has been executed, to the
resource name in the [Operation] column to locate the operation in concern.
When the link in the [Operation] column is clicked, the [Progress Details] dialog is displayed.
The [Progress Details] dialog displays the following information:
Progress List
The list of the executed processes and the status are displayed for the selected operation.
If an operation is performed simultaneously for multiple resources, the processes are displayed in a tree view for each target resource.
Message List
The list of any error messages that occurred during the operation is displayed.
Detailed information is displayed under the list when each message is selected.
For the operation that can be cancelled, The <Cancel> link is displayed to the right of the [Status] column.
Clicking this link displays a confirmation dialog for cancelling the operation.
A.11 Event
This section describes the event area of the ROR console.
Figure A.7 Event
The event log displays a history of events that have occurred on managed resources. These events are added to the log automatically.
Each event provides the following information.
- 183 -