Juniper Networks EX3200 Switch User Manual


 
CHAPTER 4
Site Preparation
Site Preparation Checklist for EX3200 and EX4200 Switches on page 87
General Site Guidelines for EX Series Switches on page 89
Site Electrical Wiring Guidelines for EX Series Switches on page 89
Environmental Requirements and Specifications for EX Series Switches on page 90
Site Preparation Checklist for EX3200 and EX4200 Switches
The checklist in Table 25 on page 87 summarizes the tasks you need to perform when
preparing a site for EX3200 or EX4200 switch installation.
Table 25: Site Preparation Checklist
DatePerformed ByFor More InformationItemor Task
Environment
“Environmental Requirements and
SpecificationsforEXSeriesSwitches”
on page 90
Verifythat environmental factorssuch as
temperatureandhumiditydonotexceedswitch
tolerances.
Power
Measure distance betweenexternal power
sources and switchinstallation site.
Locate sitesfor connection of system
grounding.
“PowerSpecifications forEX3200
and EX4200Switches” on page101
Calculatethe powerconsumption and
requirements.
Hardware Configuration
“EX3200 and EX4200Switches
Hardware Overview”on page3
Choosethe number and types of switchesyou
wantto install.
Rackor Cabinet
87Copyright©2010,Juniper Networks,Inc.