5–Installation in a VMware Environment
Deploying NPIV for VMware ESX/ESXi 4.0
5-34 FE0254601-00 A
c. Confirm the node WWN and port WWN in the WWN Assignment field
of the Virtual Machines Properties window (Figure 5-45).
Figure 5-45. Confirm Node and Port WWNs
NOTE:
Do NOT power on the virtual machine prior to configuring zoning and
LUN masking.
For information on zoning configuration, refer to the FCoE switch
documentation.
For information on LUN masking, refer to the storage array
documentation.