Q-Logic 8100 SERIES Network Cables User Manual


 
FE0254601-00 A C-1
C Brocade CEE/FCoE
Switch/Blade Configuration
This appendix describes how to use the switch CLI to configure the Brocade
FCoE switch port as a virtual Fibre Channel port. This configuration enables
communication between the Fibre Channel and FCoE devices attached to the
switch.
Configuring the Brocade FCoE switch involves the following steps:
1. Enable the Ethernet Switch Service (optional for Brocade 8000 series FCoE
switch)
2. Create and configure the FCoE VLAN.
3. Create and configure the CEE-MAP.
4. Configure the LLDP/DCBX for FCoE.
5. Configure the CEE port.
6. Verify that the Converged Network Adapter is logged into the switch.
The steps and commands presented in this appendix may vary depending on your
switch model and the firmware version installed on the switch. For detailed
information about configuring the switch, refer to the Brocade switch configuration
guide.
This configuration procedure assumes that:
The FCoE10-24 blade resides in slot 7 of the backbone switch
(DCX/DCX-4S backbone only).
The QLogic 8100 Series Adapter is attached to the Brocade FCoE switch
port 0/19.
A Fibre Channel target device is attached to Fibre Channel port 0/1 on the
Brocade switch.
You have administrator authority on a workstation that is capable of running
the Brocade switch CLI.
The VLAN number 1002 is available for use as an FCoE VLAN.