5 Upgrading an Existing G700 with an S8300: Complete the Upgrade Process (S8300 is the Primary
Controller)
Installation and Upgrades for G700 with S8300 or S8700
555-234-100 — Issue 3 — May 2003
237
Complete the Upgrade Process
(S8300 is the Primary Controller)
Telnet to the S8300 (primary controller) and open a SAT session to complete the following procedures.
Check Media Modules
1.
Type list configuration all and press Enter.
2. Verify that the software is communicating with all media modules and that all media modules are
listed in the reports.
3. Make test telephone calls to verify that Communication Manager is working.
Enable Scheduled Maintenance
1.
Type change system-parameters maintenance and press Enter.
2. Ensure that the Start Time and Stop Time fields’ administration is the same as before the
upgrade.
Enable TTI
Note: Perform this step only if you disabled TTI before the upgrade.
1. Type change system-parameters features and press Enter to change the TTI field
back to its value before the upgrade.
2. Go to the second page and set the Terminal Translation Initialization (TTI)
Enabled? field to
y and press Enter.
Check TTI Status
1.
Type status tti and press Enter.
2. Check the Percent Complete field.
If the value is
100, then go on to the next section.
If the value is less than 100, repeat Steps 1 and 2 until the
Percent Complete field is 100.
Busy Out Trunks
1.
Busy out trunks that were busied out before the upgrade (see Record All Busyouts).
Resolve Alarms
1. Click View Current Alarms to examine the alarm log.
2. Resolve new alarms since the upgrade through Communication Manager using the appropriate
maintenance book.
Check for Translation Corruption
1. Type newterm and press Enter.