Avaya G700 Network Router User Manual


 
1 Roadmap and Reference: Installation Roadmap and Task Lists
30
Installation and Upgrades for G700 with S8300 or S8700
555-234-100 — Issue 3 — May 2003
Checklist 1:
Install a New G700
with an S8300 (Primary or LSP)
Use the following checklist to install a G700 Media Gateway with the following characteristics:
• The G700 has an S8300 Media Server configured as the primary controller, or,
• The G700 has an S8300 Media Server configured as an LSP and is controlled by either an S8300 or
an S8700 Media Server.
You will use Chapters 2 and 3 with this checklist.
For help with connecting to and logging in to the G700 or S8300, see Connection Methods
in this chapter.
Checklist 1. Install New G700 with an S8300 (Primary or LSP)
Task Subtasks
“Installation Overview” on page 89
- G700 components
- Software and firmware files
- Access to the S8300 and G700
“Before Going to the Customer Site” on
page 92
- Get planning forms
- Get the G700 serial number
- Check FTP server for backups
- Complete the RFA process
- Download update (Patch) software to laptop, if necessary
“Installing Hardware for the G700 Media
Gateway and S8300 Media Server” on
page 61
- On site checklist
- Unpack and check the order
- Install the G700
- Cable multiple units
- Attach ground conductors
“On Site Preparation for the Installation”
on page 95
- Install new license file, if necessary
- Install authentication file, if necessary
- Save translations
- Determine software to install
“Install New Software on the S8300” on
page 101
- Set time, date, and timezone
- Install new software
1 of 3