1 Roadmap and Reference: Installation Roadmap and Task Lists
32
Installation and Upgrades for G700 with S8300 or S8700
555-234-100 — Issue 3 — May 2003
“Set Up SNMP Alarming on the G700”
on page 157
“Complete the Installation of S8300 (if
the Primary Controller)” on page 159
- Register the system
- Back up the system
- Check planning documentation
- Connect and administer test endpoints
- Complete electrical installation
- Enable adjunct systems
“Complete the Installation Process” on
page 160
- Check planning documentation
- Connect and administer test endpoints
- Complete electrical installation
- Enable adjunct systems
Checklist 1. Install New G700 with an S8300 (Primary or LSP) Continued
Task Subtasks
3 of 3