Avaya G700 Network Router User Manual


 
1 Roadmap and Reference: Installation Roadmap and Task Lists
Installation and Upgrades for G700 with S8300 or S8700
555-234-100 — Issue 3 — May 2003
31
“Configure the S8300” on page 109 - Backup data
- Set server indentities
- Configure Ethernet interfaces
- Configure LSP
- Configure Ethernet adjuncts
- Configure External DNS server
- Set Static network routes, if necessary
- Configure network time server
- Set modem interface
- Update system
- Load Key files, if necessary
“Configure the G700 Media Gateway”
on page 124
- Assign IP addresses to the G700 processors
- Set up IP routing for the stack
- Set up default IP route for the G700
- Check IP connections
- Set up controller list for the G700
- Configure X330 Expansion Module, if necessary
“Install New Firmware on the G700” on
page 132
- Verify contents of the tftp directory
- Determine which firmware to install
- Install firmware on the P330 stack processor
- Install firmware on the G700 media gateway processor
- Install firmware on the media modules
- Install firmware on other G700s in the stack or network, if any
“Administer Communication Manager”
on page 139
- Reboot the system
- Assign node names, if necessary
- Administer network regions
- Assign LSPs to network regions
- Administer IP interfaces
- Administer the LSP form
- Add media gateway
- Verify changes
- Enable announcements, if necessary
- Save translations
“Considerations for IP Phones Supported
by a Local Survivable Processor” on
page 156
Checklist 1. Install New G700 with an S8300 (Primary or LSP) Continued
Task Subtasks
2 of 3