CHAPTER 8 Chapter System Startup/Shutdown and Power Control
8.3 Scheduled operations
163
C122-E175-01EN
FIGURE 8.5 [Power Control] window
The "#" column has the partition number.
For details on the [Power Control] window, see ‘1.3.1 [Power Control] window’ in “PRIMEQUEST 2000 series
Tool Reference” (C122-E177).
3. Set the ‘Power Control’ of the partition number to be powered off to [Power Off], and click the [Apply]
button.
-> The specified partition will be powered off.
Remarks
In Windows, Server View Agent is required when shutdown is executed from the MMB Web-UI. For details on
the method of setting the Server View Agent, see the description of ‘System shutdown’ tab in the “Server
View Operations Manager Installation Server View Agents for Windows”.
In VMware, shutdown cannot be performed by VMware. Perform shutdown on VMware.
8.3 Scheduled operations
This section describes scheduled operations.
8.3.1 Powering on a partition by scheduled operation
When a scheduled operation is set for a partition, power is turned on, at the set time.
Daily, weekly, monthly, specific date or a combination of these options can be set as a schedule.
Note
The times recorded in the SEL may lag behind the scheduled operation as can be seen below.
- After the configuration check and preparation for the startup has been carried out, the power is turned on.
It takes a while to start. In such case, the display of the SEL may be delayed by six to eight seconds, from
the scheduled operation time.
- Shutdown instruction from the MMB to the operating system is executed within few seconds from the set
time. However, the time shown below may change under various conditions, like setting, configuration,
etc.