May 2003 Installing the 201i server in the Succession CSE 1000 system
Part 2: 201i Server Hardware Installation 105
What’s next?
Continue with “Installing the NTRH3502 SCSI cable for Succession
CSE 1000” on page 106.
ATTENTION
Do not push the 201i server into place against the
backplane until you are ready to observe the startup
cycle.
If the Media Gateway or Media Gateway Expansion is
connected to a power source, the 201i server receives
power as soon as it makes contact with the backplane.