May 2003 Preparing for installation
Part 2: 201i Server Hardware Installation 31
Installation checklist
The following checklist identifies the steps required to install the 201i server
and peripheral devices. For more details, see Chapter 7, “Connecting
peripheral devices to the 201i server.”
.
WARNING
Risk of personal injury and hardware failure
The power outlets that are used by the CallPilot server and its
peripheral devices must be connected to the same ground
reference as the one used by the Meridian 1 switch or
Succession CSE 1000 system with MGate cards connected to
the CallPilot server. If this requirement is not met, power
transients can cause personal injury and hardware failure.
Step Description Check
1 Ensure that you have reviewed the “Installing CallPilot”
section in Part 1 of the CallPilot Installation and
Configuration binder and completed stage 1 of the
“Installation checklist.”
This includes the following tasks:
❒
Unpack the server, and ensure you have all the items you
need (see page 35).
Complete the following checklists that are provided in
Part 1 of the CallPilot Installation and Configuration
binder:
—“CallPilot software media and documentation
checklist”
—“CallPilot server hardware checklist”
❒
Inspect the server for any damage that might have
occurred during shipping (see page 35).
❒