Nortel Networks 201i Network Card User Manual


 
Part 2: 201i Server Hardware Installation v
Publication history
May 2003
Standard 1.0 of CallPilot Installation and
Configuration, Part 2: 201i Server Hardware
Installation is released for CallPilot 2.02 general
availability. Information on single-point grounding
has been added to Chapter 2, “Preparing for
installation”.
September 2002
Standard 1.0 of CallPilot Installation and
Configuration, Part 2: 201i Server Hardware
Installation is released for CallPilot 2.0 general
availability.