Nortel Networks 201i Network Card User Manual


 
May 2003 Installing the 201i server in the Succession CSE 1000 system
Part 2: 201i Server Hardware Installation 107
Note: Alternate connection scenarios are supported, but are not depicted in
this guide. If you want to use a connection scenario that is not described in
this guide, ensure that you use appropriate cabling for each device.
Before you begin
1. Before you install the SCSI devices in a daisy chain, you must configure
the SCSI device IDs and DIP switches. For instructions, see Preparing
peripheral devices, on page 119.
2. Ensure that you have the EMC Kit (NTRH3503).
The kit contains ferrites that must be installed on the NTRH3502 SCSI
cable to maintain Media Gateway or Media Gateway Expansion EMC
requirements. If you do not have the kit, contact your Nortel Networks
distributor.
To install the NTRH3502 cable
1 Remove the inner SCSI bracket from the inside of the Media Gateway or
Media Gateway Expansion.
See the diagram on page 108.