SpectraLink 600V3 Server User Manual


 
Introduction to KIRK Wireless Server 600v3 25
KIRK Wireless Server 600v3 Installation and Configuration Guide
2.1.6 KIRK Maintenance Software
KIRK telecom provides the following software applications for the installation and maintenance of
the KIRK Wireless Server 600v3:
Web based Administration Page
Used for programming of the KIRK Wireless Server 600v3 and registration of KIRK
Handsets.
KIRK Configuration Tool
Used for programming of the KIRK Wireless Server 600v3.
•ServiceTool
Used for programming of the KIRK Repeater, adjustment of the KIRK Handset and software
download to KIRK Repeater/KIRK Handset.
The ServiceTool application can be downloaded from www.telecom.com.
2.2 Requirements for the KIRK Wireless Server 600v3 Solution
This section provides information about the environmental and electrical requirements and
software requirements for the KIRK Wireless Server 600v3 solution.
2.2.1 KIRK Wireless Server 600v3
2.2.1.1 Environmental Requirements
The following is a list of recommendations for suitable installation conditions:
Verify that the installation area is clean, dry, and protected from weather extremes.
Verify that the floor of the installation area is finished with linoleum, vinyl, ceramic, wooden
flooring, computer floor tiles, or polished sealed concrete. Carpeting is not recommended.
Verify that the ceiling of the installation area is finished or treated to prevent particle
discharge.
Verify that the installation area is well lit, and that the light source is uniformly diffused
without shadows. Adequate lighting should provide a comfortable reading level and allow the
identification of wire insulator colors without undue eye fatigue. Lighting should be
comparable to an office work environment, with a minimum level of 70 foot-candles at each
work surface. As a general rule, in a room with a 2.5m ceiling, one 1.2m fluorescent tube
provides sufficient illumination for 1.9-2.4 sq m .