SpectraLink 600V3 Server User Manual


 
47
KIRK Wireless Server 600v3 Installation and Configuration Guide
Chapter 5 KIRK Repeater Installation
This section provides information about the KIRK Repeater and how to unpack and install it.
Installing repeaters requires a software installation as well as a hardware installation.
Before you install the equipment, ensure that a site planner defines the location of the KIRK
Repeaters.
This section includes information about:
“Unpacking” on page 47
“Unpacking the Shipping Container” on page 47
“KIRK Repeater Description” on page 48
“Installing the KIRK Repeater” on page 49
“Recording the Installation Information” on page 52
“Checking Indicators” on page 52
“Powering the KIRK Repeater” on page 52
“Programming a KIRK Repeater with the KIRK Programming Kit” on page 52
5.1 Unpacking
5.1.1 Inspect for Damage
1 Inspect the shipping carton for evidence of physical damage or mishandling prior to opening.
2 Inspect all parts for damage.
3 Report any damage to the carrier immediately.
4 If it is necessary to make a damage claim for the carrier, do not move the shipping carton until
it has been examined by a representative of the carrier.
5 Dispose of empty cartons in accordance with local regulations.
5.2 Unpacking the Shipping Container
For indoor installations, the following items should be present in every box containing a KIRK
Repeater:
•KIRK Repeater
Mounting template for indoor installation
Two mounting screws and anchors
5