Lantronix 900-510 Switch User Manual


 
SLB™ Branch Office Manager User Guide 22
3: Installation
This chapter provides a high-level procedure for installing the SLB branch office manager
followed by more detailed information about the SLB connections and power supplies.
Caution: To avoid physical and electrical hazards, please be sure to read
C: Safety Information before installing the SLB device.
What’s in the Box
In addition to the SLB branch office manager, the box contains the following items:
Part # Component Description
Adapters:
200.2066A
Adapter: DB25M (DCE), Sun w/DB25 female
200.2067A
Adapter: DB25F (DCE) to RJ45, Sun w/DB25 male and some
HP9000’s
200.2069A
Adapter: DB9M (DCE) to RJ45, SGI Onyx
200.2070A
Adapter: DB9F (DCE) to RJ45, HP9000, SGI Origin, IBM RS6000,
and PC-based Linux servers
ADP010104-01
Adapter: RJ45 rolled serial, Cisco, and Sun Netra
Note: An optional adapter for external modems is also available from Lantronix: 200.2073
Adapter: DB25M (DCE) to RJ45, external modems.
Cables:
500-184-R
Cable: RJ45 to RJ45, Cat-5, 1 Ft (.3m)
200.0063
Cable: RJ45 to RJ45, Cat-5, 6.6 ft (2 m)
500-153
Cable: RJ45 Loopback
Power Cords:
SLPP12310-01*
Inlet cord: IEC60320/C19 to NEMA 5-15P (15A), 8 FT.
SLPP12810-01**
Inlet cord: IEC60320/C19 to Schuko (EU), 8 Ft.
SLPP12910-01**
Inlet cord: IEC60320/C19 to BS1363 (UK), 8 Ft.
SLPP12A08-01**
Inlet cord: IEC60320/C19 to AS3112 (AUS/NZ), 8 Ft.
Notes: * Included with SLB088411E-01, ** Included with
SLB088412E-01