Cisco Systems MGX 8220 Switch User Manual


 
7-22
Cisco MGX 8220 Installation and Configuration
Release 5.0, Part Number 78-6430-03 Rev. D0, November 2003
Chapter
Cable Management
Figure 7-16 Cable Management Kit on the Plenum Chamber
Main Cooling and Booster Cooling Kit
The cable management kit that is installed on the cooling module and booster cooling module consists
of a set of brackets, a power routing assembly, and the cable management panel as shown in Table 7-2.
Cable management panel,
attach with 10-32 screws with
lock nuts and washers
Plenum chamber
Inner bracket,
attach with 10-32 thread
forming (self tapping)
screws and washers
Outer bracket, attach
with 10-32 screws with
locking nuts
Attach bracket to rear rail (if
present)using 10-32 thread
forming screws
H8288
Table 7-2 Cooling and Booster Kit
Description Quantity
Number 10 flat washer 12
10-32, 0.375 in. long screws with locking nuts 8
10-32, 0.375 in. long thread forming screws 8
Cable support 2
Power and fan cable management assembly 2
Short fan panel bracket 2
Cable management panel 1