HP (Hewlett-Packard) A7284-96002 Switch User Manual


 
edge switch 2/16 service manual 2–29
Diagnostics
The switch-to-HAFM server Ethernet link failed.
AC power distribution in the switch failed, or AC power was disconnected.
The switch’s CTP failed. Because the CTP card is not a FRU, CTP failure
requires replacing the switch.
YES NO
The switch appears operational.
12
Ensure the power switch is set to the Power On (1) position. Inspect the switch for
indications of being powered on, such as:
At the front panel, an illuminated PWR or ERR indicator.
Green LEDs illuminated on the power supplies.
Audio emanations and airflow from fans.
Does the switch appear powered on?
NO YES
Analysis for an Ethernet link or CTP card failure is not described in this MAP.
Go to "
MAP 0000: Start MAP
" on page 2-7. If this is the second time at this
step, contact the next level of support.
13
Verify facility AC power connections.
a. Ensure both AC power cords (PS0 and PS1) are connected to the rear of the
switch and to facility power receptacles. If not, connect the cords as directed by
the customer.
b. Ensure associated facility circuit breakers are on. If not, ask the customer set the
circuit breakers on.
c. Ensure the AC power cords are not damaged. If damaged, replace the cords.
Was a corrective action performed?
YES NO
Go to step 15.
14
Verify operation of both power supplies.