Intel SSR212PP Network Card User Manual


 
Intel Storage System SSR212PP User Guide 167
31
PRELIMINARY
Applying iSCSI Data Port
Addresses to the SP
Assembly
Perform the following procedure after replacing an iSCSI storage processor assembly.
Replacing a Fibre Channel assembly does not require these steps.
STEP 1. Start Navisphere Express on a management server. See Procedure 29, "Running
Navisphere Express," on page 163.
STEP 2. Select Services from the System options, and then Reboot.
STEP 3. Select Reboot both SPs.
The storage system takes several minutes to reboot. You can monitor the LEDs on
the back of the system, or simply wait until the system allows you to restart
Navisphere Express from the System Reboot page.
STEP 4. Repeat Steps 1—3.
STEP 5. Restart Navisphere Express (STEP 1).
STEP 6. Select iSCSI from the Manage options, then click Apply.
STEP 7. From the Manage iSCSI page, select Test.