7. To start a test, set the Measurement field to START. The RTAU waits for pattern sync or
frame sync (for framed patterns) before beginning measurement (see Figure 570-15). After
syncing, the test begins and the Measurement display changes to RUNNING.
8. As a test progresses, the results are displayed on the RTAU Config screen, in the 'Error
Counts' and 'Elapsed Time' columns.
9. To terminate a test, set the Measurement field to STOP. Setting the Mode field to
DISABLE also stops any measurements in progress and terminates the test.
10. To end a test session and restore the tested circuit to normal operation, set the Mode field to
DISABLE.
Stop! You have completed this procedure.
14866-A
RTAU CONFIG
EQUIPMENT SETUP
===============
Current User : CRAFT Test Circuit: 1-1
Line Code : INTERNAL Mode : DISABLE
SIGNAL GENERATOR SETUP
======================
Pattern Type : QRS -------------------------------------
Frame Format : UNFRAMED
Loop Code : NONE ---------------
BIT ERROR SETUP Error Counts Status Elapsed Time
=============== ============ ====== ============
Error Count : 0 Data : F Sync: ES :
Error Rate : OFF BPV : P Sync: EFS:
Error Locn : N/A Frame: RAI :
CRC :
COFA :
Test Timeout : 60 Measurement : STOP
In Minutes
Press CONTROL-A For Assistance
Figure 570-4. RTAU Config Screen