ADC Broadband System Network Router User Manual


 
ADCP-61-471 • Issue 4 • June 2000 • Section 2: Operation and Maintenance
2-50
© 2000, ADC Telecommunications, Inc.
DLP-512
Page 2 of 2
11. Perform the end-to-end test and verify error-free data.
Reference:
DLP-510 ODS2 Distribution System and QFLC/QLX Chassis End-to-End
Tests
Reference:
DLP-520 HLXC and HLXR End-to-End Tests
Reference:
DLP-522 DLX- or RLX-Equipped Circuit End-to-End Tests
12. Insert partially removed DS3 MUX back into the chassis until it is properly seated.
13. Verify that STATUS indicator on offline DS3 MUX is green and its ONLINE indicator is
extinguished.
Stop! You have completed this procedure.