Do Items Below in The Order Listed For Details Go To
4. Momentarily press the LMPTST switch on the APU front panel
and verify that all indicators light.
5. Connect terminal equipment to Craft port on the front of the MPU. DLP-504
6. Log on to the Craft Interface. DLP-526
7. Clear Alarm History. DLP-527
8. Enter Target Identifier and set date and time now or during
provisioning (the turn-up process). DLP-528
9. Configure DS3 MUX as required. DLP-529
10. Configure HLXC modules as required. DLP-531
11. Check the HLXC to HLXR voltage and current:
Version C HLXC to HLXR Voltage and Current Test. DLP-568
Version D (or Later) HLXC to HLXR Voltage and Current Test. DLP-572
12. Connect the test equipment at both ends of the system and perform an
end-to-end test between the chassis and the remote HLXR. DLP-520
13. If the DS3 MUX protect module is installed:
Execute Force/APS commands through the Craft Interface. DLP-537
Perform Manual (Force) Switch to Protect test on DS3 MUX
module. DLP-511
Perform APS test on DS3 MUX module. DLP-512
14. Coordinate the test with a technician located at the remote end of
the circuit and ensure test procedures there have been completed.
Refer to the Soneplex Version D HLXR Remote System Operation
and Maintenance Manual, listed under Related Publications at the
beginning of this manual.
15. At both ends of the circuit, make any necessary cross-connects at
the distribution frames. DLP-515
16. Log off from the Craft Interface system. DLP-564
17. Complete assignment forms and update office records as required by
local procedures. DLP-523