Fujitsu M10-4S Server User Manual


 
Note -
Inactive/cold maintenance can be performed only for a building block configuration.
The inactive/cold maintenance procedure for a single-chassis configuration is the same as
that for stopping the system.
Note -
In the case of a dual power feed, connect the power cords in their original positions by
referring to the record that you made before the start of maintenance.
11.6.3 Inactive/Hot maintenance
For a single-chassis configuration
1.
Log in to the XSCF s hell.
2.
Return t o the op eration of the XSCF firm w are replacefru command to confirm
that th e fan un it has be en incorporated into the sy stem.
For details, see "6.1 Incorporating an FRU into the System with the replacefru
Command."
3.
Start th e entire system.
For details, see "6.4 Starting the Entire System."
4.
Close t he rack d oor.
For a building-block configuration
1.
Log in to the XSCF s hell.
2.
Return t o the op eration of the XSCF firm w are replacefru command to confirm
that th e fan un it has be en incorporated into the sy stem.
For details, see "6.1 Incorporating an FRU into the System with the replacefru
Command."
3.
Pow er on the physical p artition requiring main t enan ce.
For details, see "6.3 Powering On the Physical Partition Requiring Maintenance."
4.
Close t he rack d oor.
11.6.4 Inactive/Cold maintenance
1.
Connect all the pow er c ords to t he PSU backplane unit o f the chassis
requiring mai nten ance.
For details, see "6.5.1 Installing the power cord."
2.
Return t o the op eration of the XSCF firm w are replacefru command to confirm
that th e chassis has been incorporat ed into the system.
For details, see "6.1 Incorporating an FRU into the System with the replacefru
Command."
Fujitsu M10-4/Fujitsu M10-4S/SPARC M10-4/SPARC M10-4S Service Manual
December 2013216