5 - 14
Project name QEX7
Program name MAIN
Ladder example
Create the following ladder with GX Works2 and write it to the CPU of the
demonstration machine. Then check that the MOV instruction works properly.
D1
D0
D1
X0
X1
K200MOV
0
5
RST
RST
D0MOV
D0
Operating Procedure
The following procedures are the same as the
Operating Procedure
in section 4.4.
(1) Creating a new project
(2) Creating a program
(3) Writing the project to the programmable controller
(4) Monitoring the ladder
• How to modify the
transfer instruction
To modify the transfer instruction, follow the procedures below.
Example: Change the transfer data K200 of [MOV K200 D0] to K100
1) Double-click the instruction to be modified.
2) The Enter Symbol window is displayed.
3) Write "1" over "2" of "MOV K200 D0".
4) Click the OK
button on the Enter Symbol window.
All data in
can be modified with the above method.
When "Insert" is displayed, press the Insert
key to change it to "Ovrwrte"
before modifying.
5) After finishing modifications, click [Compile] → [Build].