Juniper Networks EX8208 Switch User Manual


 
Table 36: Site Preparation Checklist (continued)
DatePerformedByFor More InformationItem or Task
“ACPowerSpecificationsforEX8200
Switches”on page109
“DCPowerSpecificationsforEX8200
Switches”on page110
“PowerRequirements forEX8208
SwitchComponents” on page111
PowerRequirements forEX8216
SwitchComponents
“CalculatingPowerRequirementsfor
an EX8208 Switch”on page114
Calculating Power Requirementsfor
an EX8216 Switch
“Calculating the EX8200 Switch
Fiber-Optic Cable Power Budget” on
page 120
“Calculating the EX8200 Switch
Fiber-Optic Cable Power Margin” on
page 121
Calculatethe powerconsumption and
requirements.
Rackor Cabinet
“RackRequirements foran EX8208
Switch”on page97
RackRequirements foran EX8216
Switch
“CabinetRequirements and
SpecificationsforanEX8208Switch”
on page 100
CabinetRequirements and
Specificationsfor an EX8216 Switch
Selectthetypeofrackorcabinetandverifythat
it meetsthe minimum requirements forthe
installationof the switch.
“ClearanceRequirementsfor Airflow
and Hardware Maintenance foran
EX8208 Switch”on page101
ClearanceRequirementsfor Airflow
and Hardware Maintenance foran
EX8216 Switch
Planrackor cabinetlocation, ensuring the
required spaceclearances.
Copyright ©2010,Juniper Networks,Inc.92
CompleteHardwareGuide forEX8208 EthernetSwitches