Upgrading R5si/R6si to R8r EPN and Adding Memory
3-53Release 5/6si to Release 8r
3
Re-record Announcements (TN750/B Only)
1. The off-site STS translation upgrade does not preserve the contents of
recorded announcements. Therefore, if a TN750/B Announcement circuit
pack resides in the system, re-record the announcements that were stored
on the circuit pack.
NOTE:
If a TN750C resides in the system, re-recording of announcements is
not necessary.
Administer Fiber Links
1. After all fiber optic equipment is installed, refer to
Chapter A, ‘‘Fiber Link
Administration’’.
Enable TTI
1. Type
change system-parameters features
and press Enter.
2. On the second screen, set the
Enabled?
field to
y
to activate the TTI
feature.
Check Link Status
1. Type
display communication-interface links
and press Enter.
2. Make note of all enabled links.
3. Type
status link
<
number
> and press
Enter.
4. Check the following items and note which links are in-service.
■ PPP links
■ Audix links
■ CMS links at both ends (Also, check the recovery time.)
■ ASAI links at the DEFINITY ECS end
5. Check that DS1 trunks and BRI phones are functioning normally.
6. Repeat steps 3 - 5 for each enabled link.
Resolve Alarms
1. Examine the alarm log. Resolve any alarms using
DEFINITY Enterprise
Communications Server Release 8 Maintenance for R8r
.