DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115
Issue 1
April 2000
Adding or Removing Cabinet Hardware
6-30Install a New EPN Cabinet in an Existing System
6
Figure 6-16. Switch-Connected Release 8r with SNC in EPN
Figure Notes:
1. Cabinet 1 (PPN)
2. Cabinet 2, 3, and 5 through 16 (MCC or SCC EPNs)
3. Cabinet 4 (MCC EPN
with One Switch Node)