Lucent Technologies 555-233-115 Server User Manual


 
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115
Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN
5-10Task Tables
5
Task Tables
Table 5-3, Table 5-4, and Table 5-5 provide the high-level tasks to perform the
upgrades detailed in this chapter. Refer to the appropriate page for detailed
instructions for each step.
Table 5-3. Tasks to Upgrade to Release 8r — Standard Reliability
á
Task Description Page
Save Translations
5-9
Make Source Tape for TRACS Report 5-9
Required Hardware 5-15
Follow Routine Preventive Maintenance 5-16
Label Cables 5-16
Check Link Status 5-17
Disable TTI 5-17
Power Down G2 System 5-17
Install Power-Failure Transfer Ground Wire 5-17
Disconnect Cables 5-18
Remove Circuit Packs from Module Control Carrier A 5-18
Remove CURL from Module Control Carrier A 5-18
Remove Module Control Carrier A 5-19
Unpack and Inspect Expansion Control Carrier 5-23
Install New Expansion Control Carrier A 5-23
Install Circuit Packs 5-26
Interconnect Port Networks 5-26
Verify Usable Circuit Pack Vintages 5-35
Remove Power-Failure Ground Wire 5-35
Boot the Release 8 System 5-36
Set Daylight Savings Rules 5-37
Set Date and Time 5-38
Set Additional Administration 5-40
Reconnect Cables to Upgraded EPN Cabinet 5-40
Continued on next page