Lucent Technologies 555-233-115 Server User Manual


 
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115
Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN
5-12Task Tables
5
Table 5-4. Tasks to Upgrade to Release 8r — High Reliability
á
Task Description Page
Follow Routine Preventive Maintenance
5-45
Label Cables 5-45
Check Link Status 5-46
Disable TTI 5-46
Power Down G2 System 5-46
Install Power-Failure Transfer Ground Wire 5-46
Disconnect Cables 5-47
Remove Circuit Packs from Module Control Carrier A 5-47
Remove CURL from Module Control Carrier A 5-47
Remove Module Control Carrier A 5-47
Unpack and Inspect Expansion Control Carrier 5-51
Install New Expansion Control Carrier A 5-51
Install Circuit Packs 5-55
Interconnect Port Networks — High Reliability 5-55
Verify Usable Circuit Pack Vintages 5-66
Remove Power-Failure Ground Wire 5-66
Boot the Release 8 System 5-67
Set Daylight Savings Rules 5-67
Set Date and Time 5-69
Set Additional Administration 5-71
Reconnect Cables 5-71
Power Up the EPN Cabinets 5-72
Retranslate Port Circuits 5-72
Enable TTI 5-72
Check Link Status 5-72
Enable TTI 5-72
Resolve Alarms 5-73
Enable Customer Options and Alarm Origination to INADS 5-73
Save Translations 5-74
Back Up Disk 5-74